List of services integrated with RajNivesh |
List of compliances to be done after registration as per the inspection checklist |
Department |
Compliance |
Compliance Document (Download) |
Act applicable |
Rules applicable |
Penal provision in case of non-compliance
Imprisonment of up to ……
Penalty of |
Periodicity of Compliance
Monthly/Quarterly/Half Yearly/Annually |
Compliance Start Date |
Compliance end Date |
Email/ SMS/ Both trigger date* |
Approval |
Current Compliance Status
Yes/ No |
Factories and Boilers Inspection Department |
RENEWAL OF BOILERS MANUFACTURES UNDER THE BOILERS ACT, 1923 |
1.List of technical persons with qualification and experience details if changed.
2.List of certified IBR welders employed with copy of certificate
3.List of Work done during the period with technical details like maximum working presure (kg/cm2), maximum design temperature (degree C), maximum size, type of materials used.
4.No fees is required. |
The Boilers Act, 1923
|
Indian Boilers Regulations, 1950 |
Not applicable |
Every 2 Years |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Chief Inspector of Factories and Boilers (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
REGISTRATION OF BOILERS MANUFACTURES UNDER THE BOILERS ACT, 1923 |
1.Submit complete profile of the Company/Factory.
2.List of available technical persons with qualifications & experience
3.List of machinery available for fabrication, testing equipments, tools etc. and other facilities available
4.List of IBR certified welders with copy of certificates
5.Certificate of calibration of testing equipments by NABL
6.No fees is required.
Download - Attached form |
The Boilers Act, 1923
|
Indian Boilers Regulations, 1950 |
|
Registration is one time with premission for 2 Year. Periodicity is 2 year. |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Chief Inspector of Factories and Boilers (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
REGISTRATION OF BOILERS UNDER BOILERS ACT, 1923 |
i. Form No.II or Form No.XVII
ii. Form No.III*View Form No.III
iii. Form No.IIIA.IIIB,IIIC
iv. Form No.IV or IV A
v. Drawings
vi. Test Reports, Boiler Attendants'Certificate, BOE certificate
Download - Attached form |
The Boilers Act, 1923
|
1.The Boilers Act, 1923
2.Indian Boilers Regulations, 1950
3.Boilers Attendent's Rules, 2011
4.Boilers Attendent's(Amendment) Rules, 2012
5.Boiler Attendant's (Amendment) Rules, 2014
6.Boiler Attendent (Amendment) Rules, 2016
7.Boiler Operation Engineers (Amendment) Rules, 2016
8.Boiler Operation Engineer's Rules, 2021
9.Rajasthan Boiler Rules 1954 |
Section 23(1) - penalty which may extend to one lakh rupees, and in the case of a continuing
contravention or failure, with an additional penalty which may extend to one thousand rupees for every
day during which such contravention or failure continues |
Registration is one time with License for 1 Year. Periodicity is 1 year. |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Chief Inspector of Factories and Boilers (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
RENEWAL OF BOILERS LICENSE UNDER BOILERS ACT, 1923 |
Boiler Attendants'Certificate, BOE certificate
Download - Attached form |
The Boilers Act, 1923
|
1.The Boilers Act, 1923
2.Indian Boilers Regulations, 1950
3.Boilers Attendent's Rules, 2011
4.Boilers Attendent's(Amendment) Rules, 2012
5.Boiler Attendant's (Amendment) Rules, 2014
6.Boiler Attendent (Amendment) Rules, 2016
7.Boiler Operation Engineers (Amendment) Rules, 2016
8.Boiler Operation Engineer's Rules, 2021
9.Rajasthan Boiler Rules 1954 |
Section 23(1) - penalty which may extend to one lakh rupees, and in the case of a continuing
contravention or failure, with an additional penalty which may extend to one thousand rupees for every
day during which such contravention or failure continues |
1 year. |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Chief Inspector of Factories and Boilers (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
STEAM PIPELINE DRAWING APPROVAL UNDER BOILERS ACT, 1923 |
i. Form No.II or Form No.XVII
ii. Form No.III*View Form No.III
iii. Form No.IIIA.IIIB,IIIC
iv. Form No.IV or IV A
v. Drawings
vi. Test Reports, Boiler Attendants'Certificate, BOE certificate
Download - Attached form |
The Boilers Act, 1923
|
Indian Boilers Regulations, 1950 |
Section 23(1) - penalty which may extend to one lakh rupees, and in the case of a continuing
contravention or failure, with an additional penalty which may extend to one thousand rupees for every |
Not applicable |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Chief Inspector of Factories and Boilers (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
FACTORY BUILDING PLAN APPROVAL UNDER FACTORIES ACT, 1948 |
1. Form No.1 signed by the occupier /Factory Manager (If form no.2 is submitted)
View Form 1( Click Here )
2. Land ownership documents-Lease deed/rent deed/sale deed (In case of non
RIICO land, also submit land use conversion order.)
3. Approved land Plan-RIICO site plan/khasara plan.
4. Brief description of the Manufacturing Process in its various Stage.
5. Process Flow Chart.
6. List of All Raw Materials along with maximum storage capacity
7. List of all hazardous chemicals as defined along with maximum storage
capacity.
8. List of hazardous processes used for manufacturing.
9. Plan/MAPS drawn to scale showing:-
10.Safety and health policy
11.Attach Photo ID and Address proof of occupier
12.Attach Photo ID and Address proof of Factory Manager.
Download - Attached Form |
The Factories Act, 1948
|
The Rajasthan Factories Rules, 1951 |
Section 92 - punishable with imprisonment
for a term which may extend to 2
[two years] or with fine which may extend to 3
[one lakh rupees] or with
both, and if the contravention is continued after conviction, with a further fine which may extend to 4
[one
thousand rupees] for each day on which the contravention is so continued |
Not applicable |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Chief Inspector of Factories and Boilers (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
REGISTRATION OF FACTORIES UNDER FACTORIES ACT, 1948 |
Form No. 2 duly signed
List of Directors/Partners
Partnership deed/Memorandum of Articles Association
Load Sanction Copy / Electricity Bill
Attach ID proof and Address Proof of Occupier.
Attach ID Proof and Address proof of Manager.
Download - Attached Form |
The Factories Act, 1948
|
The Rajasthan Factories Rules, 1951 |
Section 92 - punishable with imprisonment
for a term which may extend to 2
[two years] or with fine which may extend to 3
[one lakh rupees] or with
both, and if the contravention is continued after conviction, with a further fine which may extend to 4
[one
thousand rupees] for each day on which the contravention is so continued |
Registration is one time. License period from 1 Year to maximum 10 years. Minimum Periodicity is 1 year and maximum periodicity is 10 years |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Chief Inspector of Factories and Boilers (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
AUTO RENEWAL OF FACTORIES LICENSE UNDER FACTORIES ACT, 1948 |
Not applicable |
The Factories Act, 1948
|
The Rajasthan Factories Rules, 1951 |
Section 92 - punishable with imprisonment
for a term which may extend to 2
[two years] or with fine which may extend to 3
[one lakh rupees] or with
both, and if the contravention is continued after conviction, with a further fine which may extend to 4
[one
thousand rupees] for each day on which the contravention is so continued |
License period from 1 Year to maximum 10 years. Minimum Periodicity is 1 year and maximum periodicity is 10 years |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Auto (Yes/No) |
Yes or No |
Factories and Boilers Inspection Department |
Safety guard or fencing are provided to all moving parts of machineries |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Striking gear and devices are provided for cutting off power in case of any emergency |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Are there any hoist and lifts used, If yes then examined by competent person |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Are there any Lifting machines, chains, ropes and lifting tackles available (attach list) |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
If Lifting machines, chains, ropes and lifting tackles available, examined by competent person |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Are there any pressure vessels used during process, If yes then examined by competent person (attach list) |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Floors, stairs and passages are provided and maintained safe means of access to every place at which any person is at any time required to work |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Any pits, sumps openings in floors are securely covered or fenced |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Effective measures are provided to control any excess fumes, dust and gas |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Fire fighting facilities provided to control fire incident in case of fire. |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Qualified Safety Officers shall be appointed where 1000 workers are ordinarily employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Safety committee shall be constituted in every factory wherein more than 50 workers are ordinarily employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
As per Indian standard, Personal Protective equipments like safety belts, helmets, safety shoes ,goggles , mask and gloves are available in sufficient quantity for workers employed therein |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Health and Safety policy prepared in every factory wherein more than 50 workers are ordinarily employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Workers employed in hazardous process are medically examined by factory medical officer or certifying surgeon |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Health register of workers maintained in form no. 19 |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Occupational Health Centre shall be provided in every factory wherein more than 500 workers employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Ambulance van is available |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Sensors with alarm system are provided for detection of leakage of chemicals |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
In case of leakage of chemicals, Proper Neutralization Arrangements provided |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Safety Precautions Board displayed at various approach location within factory premises |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Safety training given to all workers |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Record of Safety training given to all workers maintained |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Safety relating to Manufacturing Process |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Compliance of last inspection verified |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Cleanliness status of work place such as Floors, stairs and passages are cleanliness |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Effective arrangements are provided for the treatment of waste and effluents |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Effective arrangements are provided for control of excess dust and fumes |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Drinking water facilities available in factory |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Latrines and urinals are provided in proportion to the no. of male and female workers employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Latrines and urinals are connected to sewerage system |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Sufficient and suitable lighting (natural or artificial or both) shall be provided in every part of factories |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Adequate and suitable facilities for washing provided and maintained for the use of the workers |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
First aid facilities available in factory |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Canteen provided in every factory wherein more than 250 workers are ordinarily employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Shelters, rest rooms and lunch rooms provided in every factory wherein more than 150 workers are ordinarily employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Creches provided in every factory wherein more than 30 women workers are ordinarily employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Welfare officer shall be appointed in every factory wherein more than 500 workers employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Ambulance room provided in every factory wherein more than 500 workers are ordinarily employed |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
a. Muster-roll |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
b. Payment Register |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
c. Overtime register. |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
d. Accident register |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
e. Leave with wages register |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Single Integrated Return submitted |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |
Yes or No |
Factories and Boilers Inspection Department |
Building Stability Certificate received from competent person |
Download 1 - https://labour.gov.in/sites/default/files/factories_act_1948.pdf
Download 2 - https://upload.indiacode.nic.in/showfile?actid=AC_RJ_83_1123_00023_00023_1563790759618&type=rule&filename=rajasthan_factories_rules,1951.pdf |
Factories Act, 1948 |
Rajasthan Factories Rules, 1951 |
Imprisonment upto - punishable with imprisonment for a term which may extend to two yearsor
Penalty of - fine which may extend to one lakh rupees |
Annually |
Date of Registration or Date of last inspection (which ever is later) |
Date of compliance submission |
Date of Email |
Not required |